| |
Latest News
Our History
Contact Us
Useful Links
Our Facilities
MailMax Direct accquired the former Solar King building from the City of Waco in 2001. Our facilities are easily identified from West Loop 340 (Highway 6) with solar panel arrays lining the angular portion of the main building. The main building houses our production floor, breakroom, gymnasium, conference rooms, administrative offices and our data processing center. Our data processing center has a dedicated climate controlled system, and is protected by a non-destructive gaseous fire retardant system and fire resistant building materials. All of this space allows us to provide a full range of print to mail services.

Panoramic photo of main building.

Aerial photo of facilities.

Various production stations.
|